Prepare line signals
Pin process parameters, material lots and measured yield or quality per batch or shift.
Process and yield optimisation from plant signals. The model recommends; engineers decide; nothing controls equipment.
Yield and quality vary with hundreds of process parameters across shifts and lines. A model that learns which settings produced good output can recommend setpoints, but it must be retrained as materials and equipment change and must never act on its own. This design keeps the recommendation behind an engineer's approval.
Pin process parameters, material lots and measured yield or quality per batch or shift.
Run the partner's model predicting yield or quality from process settings.
Score the candidate against the current model on the same held-out production periods.
Recommendations reach operators only after a process engineer reviews them. No autonomous control.
The signal windows, material lots, the candidate, held-out comparison, the recommendations, and the approver.
Yield, first-pass quality and scrap per line.
A recommendation is a proposal to an engineer, recorded with the model version that produced it.
Each shift's measured outcome becomes training data for the next candidate.
Reference design, not a shipped domain pack. Setpoint changes stay in the plant's control system and under the engineer's authority.
See how failure can trigger a reviewed improvement cycle →Talk about your process data, quality measurements and who owns setpoints.